Blog

Notes from the bench

Notes on taking a connected product from a working prototype to boxes leaving the factory. Each one starts with something that happened, then gets practical.

Visiting EMS suppliers.
Visiting EMS suppliers.
Latest post

Who owns your design?

Two kinds of factory look alike from the outside. How to tell who will own your design, pick a factory that fits your size, and read its quote.

8 min readThe factory

Read the post →

Earlier posts

  1. CE certification in China — far faster and cheaper.

    8 min readProduction

    The paperwork that can stop your launch

    Who the law holds responsible for your connected product, what CE and FCC really ask, how long the lab takes, and what the EU's 24-hour rule means.

  2. Inspecting product on the factory floor.

    8 min readProduction

    Four places to catch a defect

    Why a defect costs about ten times more at every stage it survives, the four checkpoints on a production line, and how checking 125 units judges 3,000.

  3. The PadelPlay sensor on the bench — first hardware bring-up.

    8 min readDesign

    Before you cut steel

    How an injection mold works, why the first parts come out wrong on purpose, what a late design change costs, and what to settle before you order one.

  4. Dutch national news, filming our China supply chain during Covid.

    8 min readBefore you build

    Where a year goes

    From idea to first shipment takes 1 to 2 years. Where the weeks go (molds, labs, ships, holidays) and how to plan your calendar backwards.

  5. From clunky remote to a wearable stop control — redesigning the safety control.

    8 min readDesign

    One prototype, one question

    A prototype is an experiment that answers one question. How to pick the cheapest build, plan EVT, DVT and PVT, and freeze the design before steel is cut.

  6. Early Xeelas. Small office, the grind is real.

    8 min readBefore you build

    What a hardware product really costs

    What a connected product costs before the first production run, why one unit costs more than the factory quote, and how to check your retail price.

  7. Shipping units, Xeelas days.

    8 min readShipping

    Batch one proves nothing

    Why the first batch from a factory is usually the best one, how to keep batch 10 just as good, and how to get the boxes to your customer undamaged.

  8. Visiting battery suppliers.

    8 min readDesign

    Measure the battery. Don't calculate it.

    Why sleep current and cold decide your battery life, how to measure a full real day on real hardware, and which number to promise your customer.

  9. Down a German mine — LoRa trackers on the machines in the tunnels.

    8 min readProduction

    Test it the way the world will

    How to find out before you ship whether your product still works in year two: a test plan built from real abuse, testing to failure and a return log.

  10. Building relationships in China, with co-founder Koos.

    8 min readThe factory

    Own your files

    Three contracts, six sets of files and one trademark keep your product yours if a factory relationship turns sour. What to sign and collect, and when.

  11. Factory PCBA testing and label-printing setup.

    8 min readProduction

    Run a small batch before the big one

    A pilot run is 30 to 100 units built on the real line to find problems while they're cheap. What it must prove, and four things to have ready first.

  12. First photo in China, 2016 — the factory guys we built Shake-On with.

    8 min readThe factory

    Go and stand on the factory floor

    What to look at on a factory visit, what a $1,000 audit buys, and how to find out how much a factory can really make before you pay a deposit.

  13. Holding the insole samples.

    8 min readDesign

    Design for the person on the line

    How to turn a prototype that works once into a design a factory can build 10,000 times: change early, delete parts, set tolerances, fix the hard specs.

  14. First successful event with the team.

    8 min readBefore you build

    Get a yes before you build

    How to get proof that people will pay before you design a hardware product: 20 conversations, one page of testable numbers and a short feature list.