Notes from the bench
Notes on taking a connected product from a working prototype to boxes leaving the factory. Each one starts with something that happened, then gets practical.

Who owns your design?
Two kinds of factory look alike from the outside. How to tell who will own your design, pick a factory that fits your size, and read its quote.
Read the post →Earlier posts

The paperwork that can stop your launch
Who the law holds responsible for your connected product, what CE and FCC really ask, how long the lab takes, and what the EU's 24-hour rule means.

Four places to catch a defect
Why a defect costs about ten times more at every stage it survives, the four checkpoints on a production line, and how checking 125 units judges 3,000.

Before you cut steel
How an injection mold works, why the first parts come out wrong on purpose, what a late design change costs, and what to settle before you order one.

Where a year goes
From idea to first shipment takes 1 to 2 years. Where the weeks go (molds, labs, ships, holidays) and how to plan your calendar backwards.

One prototype, one question
A prototype is an experiment that answers one question. How to pick the cheapest build, plan EVT, DVT and PVT, and freeze the design before steel is cut.

What a hardware product really costs
What a connected product costs before the first production run, why one unit costs more than the factory quote, and how to check your retail price.

Batch one proves nothing
Why the first batch from a factory is usually the best one, how to keep batch 10 just as good, and how to get the boxes to your customer undamaged.

Measure the battery. Don't calculate it.
Why sleep current and cold decide your battery life, how to measure a full real day on real hardware, and which number to promise your customer.

Test it the way the world will
How to find out before you ship whether your product still works in year two: a test plan built from real abuse, testing to failure and a return log.

Own your files
Three contracts, six sets of files and one trademark keep your product yours if a factory relationship turns sour. What to sign and collect, and when.

Run a small batch before the big one
A pilot run is 30 to 100 units built on the real line to find problems while they're cheap. What it must prove, and four things to have ready first.

Go and stand on the factory floor
What to look at on a factory visit, what a $1,000 audit buys, and how to find out how much a factory can really make before you pay a deposit.

Design for the person on the line
How to turn a prototype that works once into a design a factory can build 10,000 times: change early, delete parts, set tolerances, fix the hard specs.

Get a yes before you build
How to get proof that people will pay before you design a hardware product: 20 conversations, one page of testable numbers and a short feature list.