Blog · The factory

Who owns your design?

Two kinds of factory look alike from the outside. How to tell who will own your design, pick a factory that fits your size, and read its quote.

In 2022 I was asked to become CTO of Viloc, a Belgian startup with a tiny anti-theft tracker. The brief was short: create order, and get the product finished for mass production and sales. I brought in Koos Habte, we got it on track, and today the tag sells in volume.

Two years later I started Insyght, and Koos came along. There's a belief behind how we work there. Most IoT projects (connected devices, things with a sensor and a radio) fail for a reason that has little to do with engineering. The team is split across four vendors, and nobody owns the product.

One company does the electronics. Another does the housing. A third writes the app. The factory is a fourth. When something goes wrong, each of them is right about their own part.

So we keep it in one team, from the first circuit board to the factory floor. That's also why I travel to Shenzhen regularly for production and sourcing.

Visiting EMS suppliers.
Visiting EMS suppliers.

The same question comes back the day you pick a factory. Who owns this design? Two kinds of factory look alike from the outside. With one of them the product is yours. With the other it never was, and you want to know which before you pay a deposit.

Two kinds of factory

An ODM (original design manufacturer) already has a product. You pick a color, add your logo and change the box. You can be selling in weeks to a few months, and it costs very little to start.

Legally, though, you're a distributor of somebody else's product. If quality drops or the price goes up, you have nothing to take elsewhere, and the factory can sell the same product to your competitor next month.

A contract manufacturer (CM) works the other way around. For electronics it's often called an EMS (electronics manufacturing services). You arrive with your own design, and the factory is paid to build it on its line. The drawings, the parts list, the firmware (the software that runs on the chip inside the device) and the molds are yours. You pay for the engineering and the tooling, and it takes many months before the first boxes ship. In return you can collect your molds and move.

ODM or contract manufacturerODMContract manufacturerWhose design is it?Theirs, with your logo on itYoursCost to startLowYou pay for engineering and toolingTime to marketWeeks to a few monthsMany monthsWho holds the files?The factoryYouCan you switch factory?No. You start over.Yes
An ODM and a contract manufacturer side by side. Every row comes back to who owns the design.

Why free engineering costs the most

Most factory websites claim to be both, so look at the deal underneath. There are only two.

In the first, you pay for every engineering hour and everything that comes out is yours. In the second, the factory offers to rework your CAD (the 3D computer model of your parts) and find your components at no charge. That's a bet on winning your production, and the factory keeps the files as security. A factory that offers to engineer your product for free is an ODM in disguise.

You notice it the day you want to move. You ask for the final CAD and the BOM (bill of materials, the full parts list with exact part numbers and suppliers), and you don't get them. A new factory would have to redo the engineering, so you start over. And without the firmware source code (the readable version, as opposed to the compiled file on the chip), you can't fix a bug in a device that's already in the field.

The free route can be a fair trade for a first product with tight cash and unproven demand. If the product is the core of your company, or a failure is expensive (anything medical, automotive or safety related), pay for the work and own it.

Decide who holds the files first

Do this before you talk to a single factory. Write down who will own four things: the CAD files, the full BOM with real supplier names, the firmware source and the molds.

Then negotiate it before development starts. Once you've paid for tooling, nobody has a reason to hand anything over. Put it in a written agreement, and have a lawyer who knows Chinese contracts check the details.

Owning the design also means someone on your side has to understand it, because a CM builds exactly what the drawing says. I'd make that one team for the whole product. It's how we set up Insyght: electronics, firmware, enclosure, certification and production under one roof.

Dream team Insyght.
Dream team Insyght.

Shortlist factories that fit your size

A factory is only good or bad in relation to your order. An account worth about $20,000 a year interests almost nobody. At about $2 million a year you start to matter. A large CM usually wants orders of around 10,000 units, and your small order gets junior staff and the last slot in the schedule. A small one takes 1,000 units or fewer and is happy with a first-time customer, but you'll have to check its quality system yourself.

So look for a small or mid-size factory that already builds products like yours. Trade shows help. In September 2026 the Insyght team visited the IOTE expo in Shenzhen and came back with new contacts, interesting sensors and ideas for new product approaches.

Then check every candidate from your desk. Expect roughly $100 to $200 in paid record searches.

  1. Get the official Chinese company name and address, and find the address on Baidu Maps (China's version of Google Maps). One scam supplier gave an address on the 25th floor of a building that had five floors.
  2. Pull the business license. Registered capital (the money the owners put in at founding) of 1 RMB points to a trading company, a reseller that sits between you and the real factory.
  3. Check that the legal scope of business lists your product category, and look for court cases.

Send one package, then read the questions

An RFQ (request for quotation) is the package you send so a factory can price your product. Send the same package to everyone on the shortlist, and only to the shortlist.

The package has six parts: 2D drawings with tolerances (how far a dimension may be off), 3D models, the parts list with exact part numbers, your volumes (the first order and a three-year plan), the tests and standards the product has to pass, and how it's packed and on what shipping terms.

What goes in a request for a quoteFILES2D drawingsWith tolerances on the dimensionsthat matter.FILES3D modelsThe shape, for the toolmaker.LISTParts listEvery part, with exact part numbers.NUMBERSVolumesFirst order, and a plan for threeyears.QUALITYTests and standardsWhat gets tested, and what countsas good.SHIPPINGPackaging and termsHow it's packed and where it'shanded over.
Six things that belong in a request for a quote.

A good factory answers with a list of questions. A price built from a 3D file alone rests on guesses, and the guesses are now in your price. Take a needlessly tight tolerance of 0.002 inch. If nobody asks whether you need it, it stays, and you pay for every rejected part.

Here's a made-up example. You send the package to three factories for a first order of 1,000 trackers.

QuoteFactory AFactory BFactory C
Unit price$14.20$13.60$10.10
Tooling$18,000$21,000$9,000
Questions back149None

Factory C is about 27 percent under the other two and asked nothing. Maybe it didn't understand the job. Maybe it plans to raise the price once your deposit is paid and your molds are on its floor. Or it will reach the price by quietly swapping materials and skipping steps. Ask C how it gets to $10.10. If the answer is vague, choose between A and B.

Low volume: bring a finished design and a plan

Factories resist small orders because every changeover has a fixed cost: clean out the molding machine, mount the mold, brief the operators.

Say setup takes 1 hour and your part takes 1 minute to make. At 400 units that's 400 minutes of production against 60 minutes of setup, so 13 percent of the machine time earns nothing. At 20,000 units the same hour is 0.3 percent. The factory charges a setup fee, or declines.

Components are often the harder limit. The assembler agrees to build 1,000 units, but the company that makes your chip or display sets its own minimum at 10,000. You prepay for ten times what you need. Component makers are supplier relationships too, so map their minimums early.

More supplier relationships — HopeRF, a well-known LoRaWAN maker.
More supplier relationships — HopeRF, a well-known LoRaWAN maker.

What gets you a yes is a finished design and a believable three-year plan. A typical ramp: about a dozen units, then pilot runs (small trial batches on the real line) of 50 to 100, then 500, 1,000, 2,000 and up. Discuss the minimum order inside that plan, and leave it out of the first meeting.

Where it goes wrong

Taking the free engineering. It costs nothing until you want to move. Then you hold no files and no parts list, and replacing a supplier from scratch typically takes 6 to 12 months. Pay for the work and get ownership in writing first.

Picking the lowest quote. It ends in a price increase after your deposit, or cheaper materials after you've approved the sample. In a device with a lithium battery, a swapped material is a safety problem. Make every outlier explain its price.

Giving the electronics to your trusted plastics supplier. Electronics need protection against static (a shock too small to feel still damages chips), trained soldering operators and electrical test stations. One customer paid for molds at a mechanical supplier that then attempted the electronics. The molds were scrapped and the project restarted elsewhere. Check electronics capability separately.

Paying a person instead of the company. One US buyer paid a Hong Kong entity that wasn't the listed manufacturer and lost over $160,000. Pay only the company named on the business license.