In 2021 I joined Jogo to lead the hardware team. The job was to put a small Bluetooth sensor inside a football insole, and I loved that challenge. Running motion algorithms on a tiny chip was something I'd done before at Shake-On, on a bracelet that detected handshakes, and that experience paid off directly. What I had to learn was the insole itself: how insoles are made, and how a product feels. That matters as much as the electronics.

The other lesson was force. A kick puts very high G-forces on everything in the shoe. The sensor gets kicked, soaked, sweated on and thrown in a bag, every day. No test on a desk looks like that.
It taught me to write the abuse list before the feature list. Where will this thing live? What will people do to it that nobody planned for?
The factory belongs on that list too. A prototype is built by your best engineer on a good day, with a file within reach. A production unit is assembled by someone who has about 40 seconds for it and has never met you. If a part can go in upside down, it will. If two screws look alike, they'll get swapped.
So this post is about getting from a design that works once on your desk to one a factory can build 10,000 times, and that survives what people do to it afterwards.
Why a working prototype tells you so little
Look at how your prototype came to exist. One skilled person built it. When an edge stuck out, they filed it down. When a clip wouldn't close, they pushed harder. Nobody wrote any of that down, so you never found out the parts didn't quite fit.
The factory has no such person. An operator (the person doing one assembly step on the line) gets seconds per step and repeats it all day. Part 1 and part 10,000 have to go together the same way, with no file and no judgment calls.
The material changes too. Production plastic parts are injection molded, which means molten plastic is forced into a steel mold under high pressure. A 3D-printed housing can carry the same plastic name on its datasheet and still behave differently, so a drop test on a printed enclosure tells you little about the molded one.
What a change costs, stage by stage
The rule of thumb is that the same design change gets about 10 times more expensive at every stage it survives.
Say a screw post (the plastic pillar a screw drives into) sits 2 mm too close to the battery. In a sketch, moving it costs 10 minutes. In 3D CAD, the computer model of the product, it's an hour or two. After prototypes it means new parts and another round of testing. After the mold is cut, someone has to re-cut hardened steel, which takes weeks. In production you add scrapped stock, rework and returns on top.
So do the checking at the front, where it's cheap. Set three fixed checkpoints: before you lock the design, before you pay for tooling (the molds and fixtures), and before you order production quantities. At each one, sit down with someone from manufacturing and ask what could go wrong.
Delete before you improve
The most useful order of work comes from Elon Musk, and the order is strict. Question every requirement. Delete every part and step you can. Simplify what's left. Speed it up. Automate last.
Most teams run it backwards. Tesla did. Its plants automated steps that shouldn't have existed, the lines slowed down, and in the end the company cut an opening in a wall to get the equipment back out.
Questioning pays off fast. Take battery life. If your users are happy to charge once a week, a tracker specified to last a month carries too much battery. A smaller battery means a smaller enclosure, a smaller mold and a lower cost per unit.
When you get to deleting, go far enough that you have to add about 10 percent back. Start with these:
- Custom parts. If a proven, high-volume standard part does the job, use it. It needs no tooling and its defects were worked out long ago.
- Variants. Three sizes in two colors is six products to stock before you've sold one.
- Features. Cutting one nobody will miss saves more than squeezing component prices.
Make the mistake impossible
Now back to those 40 seconds. If the design itself stops the mistake, you don't need an inspector to catch it. An easy step also gets done right more often, which means fewer stops and less rework.
- Parts that fit only one way. A pin, a notch or a lopsided rib is enough. The factory term is poka-yoke, Japanese for mistake-proofing.
- One screw type. One driver on the line and no wrong-screw mistakes.
- Snap-fits where you can. The operator hears the click and knows the step is done. A screw depends on a torque driver (a screwdriver that stops at a set tightness), and those drift out of calibration.
- One assembly direction. Build from the bottom up, without flipping the product.
IBM did this to a printer in the 1980s. The original took several minutes to assemble, with parts going in from all sides. Merging parts and stacking everything from the bottom up brought that down to about 30 seconds.
Add up the tolerances and put them on the drawing
A tolerance is the allowed range around a dimension, written like 20 mm plus or minus 0.1 mm. Every part is allowed to be slightly off. The trouble starts when the small errors add up.
Here's a made-up example. Five parts stack up inside a housing: a battery, a foam pad, the circuit board, a spacer and the rib on the lid that holds it all down. Each may be up to 0.1 mm thicker than drawn. You left 0.3 mm of spare room. If all five arrive at the thick end, the stack is 0.5 mm too tall and the lid stands 0.2 mm open. Every part passed inspection.
It won't happen on every unit, but over 10,000 units it'll happen on some. So add up the worst case for every stack in the product, then leave more room or tighten the part that's cheapest to tighten.
Then write it down where the factory will look. You design in 3D, but the supplier reads the 2D drawing first: one page with the material, the finish, the dimensions and their tolerances. Later, parts get inspected against that page, and you can't reject one for something the drawing doesn't say.
Keep tight tolerances for the places where the function needs them. Lego holds its bricks to a few microns, because the snap is the whole product. The button on a cheap pen wobbles and nobody minds. Ask for tight everywhere and the supplier adds process steps that you pay for on every part.
Decide the hard specs first
Four decisions shape the whole enclosure: drop height, water rating, temperature range, and whether it can be opened for repair. You want them fixed before the CAD is detailed, and you want them as numbers. The values below are examples.
| Spec | Too vague | Testable |
|---|---|---|
| Drops | "Feels solid" | 10 drops from 1.2 m onto concrete, still connects |
| Water | "Waterproof" | IP67: dust-tight, survives a short dunk |
| Temperature | "Works outdoors" | Runs from minus 10 to 45 °C |
| Repair | "Serviceable" | Battery swap with a standard screwdriver |
These choices pull against each other. Take the insole sensor again. It had to be small enough to disappear into the shoe, and then cope with the kicks, the water and the sweat.

A sealing target such as IP67 rules out some ways of assembling and welding the housing. Clips, glue and potting (filling the housing with resin) make a product tougher and more watertight, and much harder to repair. I'd make that choice on purpose and write down why.
Where it goes wrong
Treating a working prototype as proof. It proves function. Whether the factory can repeat it is proven by a DFM review (design for manufacturing: the factory's engineers go through your CAD and flag what will go wrong in production) and by a trial batch on the real line. Skip those and you pay for a re-cut mold. Ask for the review in writing, because plenty of manufacturers say "we did a DFM review" just to close the sale.
Overruling the factory's written warnings. One team was warned twice, in writing, that a part wouldn't release cleanly from the mold. Their answer was that the prototype fit fine. In production the parts came out scuffed, the scuffs sat on a sealing surface, and the product leaked in the field. With tool rework, scrap and returns, that lands in million-dollar territory. Ask questions until you understand each flag, then decide.
Sending a render in place of a drawing. A supplier who gets only a rotating 3D picture concludes the design is immature and quotes accordingly. Send the 2D drawing as the lead document and keep track of its revisions, because one old revision on the factory floor makes a batch of wrong parts.
Testing only at room temperature. Many plastics turn brittle in the cold, so a housing that passes a drop test in the office can crack outdoors in winter. Test the assembled product at the extremes on your spec list.