At Shake-On we built a bracelet that swapped contact details when two people shook hands. It was 2016 and my first wearable: a Bluetooth band with motion sensors that had to notice a handshake and trade details with the band on the other wrist.
The hard part was telling a handshake from a high-five or a clap. This was before the AI tools existed, so there was no ready-made way to train a gesture detector and load it onto a chip. I worked it out in MATLAB (math software that engineers use), turned it into rough C code and ran it on a tiny chip, an nRF52832.
Then came my first trip to Shenzhen, to set up production. It was a different world, and the speed was unreal. We made plenty of mistakes with suppliers, mostly around the quality of their batteries.
We produced 9,000 of them.

The product worked well. The events business was the hard part, and when Covid hit, events stopped.
That's the lesson I took into everything after it. An idea is worth nothing until something works in your hand. And a thing that works is worth little until somebody wants to pay for it.
Hardware makes this mistake expensive. In software you can ship something half right and fix it next week. In hardware the half-right version is 5,000 units in a warehouse.
So this post is about the step that comes before any design work: getting proof that people will pay. It takes a few weeks and costs almost nothing, which makes it very easy to skip.
Why a wrong guess costs so much
In hardware, a guess gets cut into steel. A plastic part comes out of a mold, which is a block of steel machined to the exact shape of that part, and a mold takes weeks to make. Change the design afterwards and you pay for new tooling (the molds and fixtures that make your parts), new purchased parts and a new round of testing. One loop like that takes months.
That's why the choices you make before anyone opens the 3D design software matter more than the ones you make later, starting with whether to build the thing at all.
Why everyone says your idea is great
Ask a friend whether your idea is good and you'll hear yes. They like you, and a yes costs them nothing. Strangers do the same when you open with "wouldn't it be cool if". You get polite enthusiasm, and it feels like proof.
I'd take five paid deposits over 500 people who said it sounds nice. Two habits get you there. Ask about what they do today before you mention your idea, because people describe their own habits far more honestly than they judge your plan. Then ask for something that costs them, like money or a signature.
Talk to 20 strangers before you draw anything
The whole check is five steps, and the order matters.
Pick one narrow group. "Installers who mount solar panels on flat roofs" works. "People who care about energy" doesn't. You can't find that second group, and their answers won't agree with each other.
Talk to 20 to 30 strangers in that group. No friends and no family. Go where they already are: their shop, their trade fair, their club. Ask how they do the job now, what annoys them about it and why they picked the tool they use. Keep your idea out of it for as long as you can.

Show a cheap prop. Cardboard, a painted 3D print, a few screens on a phone. It doesn't have to work. Watch what they do with it and ask why. The reasoning tells you what to build.
Find the pattern. The same complaint from eight people out of 20 is a pattern. If person 20 still tells you something different from the 19 before, the idea needs to change and you do another round.
Ask for a yes. A pre-order, a deposit or a signed pilot (a customer agrees in writing to try a small batch). A signature costs them something, which is why it counts.
Here's a made-up example to show the counting. You want to build a clip-on sensor that warns flat-roof installers when a panel mount works loose in the wind. You talk to 22 installers. Only three mention loose mounts, but 14 bring up, without being asked, the hours they lose finding which panel in a row has stopped working. That's your pattern, and it's a different product from the one you walked in with.
So you rebuild the prop around fault-finding, go back, and ask for a $100 deposit on a pilot kit of 10 sensors. Five companies pay. You now have $500, five customers who expect a delivery, and a problem worth designing for.
Put it on one page, in numbers
Once you have a yes, write down what you're building. The formal name is a product requirements document, or PRD: a page or a few that say what the product must do, for whom, where and how well.
It exists because of how the work gets split. The industrial designer, the electronics engineer, the firmware developer (firmware is the software running inside the device) and the factory each fill every gap with their own assumption, and those rarely match. Six weeks later a lot of work rests on a guess.
The rule for every line is that a lab or a factory can answer it with pass or fail.
| Vague wish | Testable requirement |
|---|---|
| Waterproof | IP67: 30 minutes under 1 meter of water |
| Sturdy | Survives ten drops from 1 meter onto concrete |
| Long battery life | 2 years on one battery, one message per hour |
| Feels premium | Named material, texture code and color code |
| Sell it everywhere | EU and US first, so CE and FCC rules apply |
An IP rating is a two-digit code that says how well a housing keeps out dust and water. CE and FCC are the approval marks for the EU and the US.
Some lines steer the whole design, so they go on the page on day one. A metal housing around a Bluetooth radio is the classic. Metal blocks radio waves, so the antenna performs badly, and teams that find this out late lose about 3 months to a redesign. The legal class of the product works the same way: products have reached the certification lab before anyone noticed that they counted as a medical device.
Cut version 1 down to the musts
Now sort every feature into four boxes. Must ships in version 1. Should comes soon after. Could goes in only if it costs nothing. Won't gets written down as a no for this version.
Be strict, because every feature brings parts with it. A custom part (one made only for you, with its own mold) adds assembly steps, adds things that can break and makes each later change slower. Juicero is the public example. Its juice press was full of custom parts, and the tooling bill reportedly ran into hundreds of thousands of dollars before the company reached real volume. The first iPhone went the other way and shipped without copy and paste.
Then freeze the list. Keep a page called "version 2", so a new idea gets scheduled instead of argued about. Reopening the list gets expensive fast: in one case a single small change, made while the molds were being cut, added $25,000.
Test the scary part first
Every idea has one or two things nobody is sure can be done: a radio range, a battery life, a price. Run a small study on only those before you pay for detailed design. Engineers call it a feasibility study, and I wouldn't skip it for anything new.
You want a one-page sketch of the main building blocks, a first parts list with prices and delivery times, a list of the rules that apply where you'll sell, and a clear go or no-go.
One team picked a main chip without the wireless function the product needed and found out months later, which meant starting the electronics again. One wearable project had a complete parts list that still held a part with a 1-year delivery time and a minimum order of 10,000 pieces. A third team took a fully 3D-printed prototype to a test lab for a quick informal check, and fixed what the lab flagged before any mold was cut.
Where it goes wrong
Hiding from your own customers. Teams that build in secret for fear of copycats have come out 6 to 12 months and $500,000 to $1 million later with a product nobody asked for. Having 30 face-to-face conversations won't get you noticed by anyone who copies products for a living, so have them.
Making version 1 the dream product. The Coolest Cooler raised $13 million on Kickstarter in 2014 by promising a cooler with a built-in blender, a speaker, USB charging and more. The price backers paid didn't cover what it cost to build and ship one, and about a third of them never got a cooler. That's where a feature list ends up when nobody prices it before promising it. Ship the musts and put the rest on the version 2 page.
Passing the spec and still failing. One battery product had a power button specified as "press to turn on". It worked so well that factory workers pressed it by accident while packing, and customers unboxed dead units. The fix took a firmware change (a 2-second long press) and a new packaging insert. Hand a dummy with the right size and weight to people who've never seen the product, early, while changes are still cheap.