Blog · Production

Test it the way the world will

How to find out before you ship whether your product still works in year two: a test plan built from real abuse, testing to failure and a return log.

At Xeelas our devices lived in places no lab looks like. We put LoRa trackers (LoRa is a low-power radio that reaches a long way on very little battery) on machines in the tunnels of a German mine, and had to find out how to make that radio work underground.

Down a German mine — LoRa trackers on the machines in the tunnels.
Down a German mine — LoRa trackers on the machines in the tunnels.

Other units went on tank containers that sit on a ship for weeks. A container has no power of its own, so those units ran on solar. In 2018 I went back to Shenzhen to look for something better than the LiPo cells we used (lithium polymer, the rechargeable cell in most gadgets). We switched to LTO cells, a lithium type that can charge far below 0°C. A battery that won't take a charge on a cold day is no use on a container in winter.

Later, at Viloc, I was CTO of an anti-theft tracker with a 97% recovery rate. It's a small tag you hide on a machine. A tracker spends almost its whole life doing nothing anyone can see. If it quietly dies in month eight, nobody notices until the day of the theft. On that day a dead tracker is worth nothing. Allsetra, at the time the largest distributor of the tag, later acquired Viloc.

The Allsetra team — a platform for thousands of devices in the field.
The Allsetra team — a platform for thousands of devices in the field.

For products like these, reliability is the product. And a factory test doesn't measure it. A unit can pass every check on the line and still fail in a pocket or a tunnel eight months later.

This post is about finding that out before your customers do.

Two ways to fail

Quality means a unit meets its spec (the written list of what it must do) on the day it leaves the factory. Reliability means it still does two years later. The two fail separately.

A unit can be built badly and still pass. Solder paste is the grey mix of metal powder and flux that's printed on a circuit board before the parts go on. If boards wait too long before the oven, the paste dries out. The joints still form and every board passes the final test. Months later, after truck vibration and daily use, the weak joints crack. In one such case 20 to 30% of the units stopped working.

It also goes the other way: a unit built perfectly, to a design that's wrong. One maker of rack-mounted equipment chose a cooling fan rated for 0 to 50°C. Nobody measured the air inside the case, which reached about 65°C once the room was warm and the electronics were running. The factory did nothing wrong, and every shipped unit still came back for a new fan.

When products fail

Failures don't arrive evenly. Plot the number of failures against time in use and the line starts high, drops to a long flat stretch, then climbs again at the end. Engineers call it the bathtub curve.

When products failfailurestime in useFIRST WEEKSEarly failuresBad parts and assembly mistakes.Catch them on the line.YEARSUseful lifeFew failures, at random. This is whatyou promise.END OF LIFEWear-outBatteries, buttons and seals give up.Know which goes first.
The bathtub curve: early failures in the first weeks, a long useful life with few failures, and wear-out at the end.

Early failures come from bad parts and assembly mistakes: a connector that isn't fully seated, one bad reel of capacitors. In a new production run most of them show up in the first 30 days, and by day 60 they should be largely gone. You catch these on the line.

Useful life is the flat part, years long, with few failures that come at random. This is what you promise your customer. How few you get depends on margin: a 10 W resistor that only ever sees 5 W rarely dies by chance.

Wear-out is the end, when batteries, buttons and seals give up. A battery loses a little capacity with every charge, and rubber hardens with age. It can come far too early: some owners of $800 smart glasses reported a battery that was close to dead after about eight months.

Write the test plan from the abuse list

A test lab can ask good questions, but it can't know your users. You do. Write down where the product lives, how many hours a day it's used, and every way people will mistreat it.

Hours of use is the classic surprise. The first smartphones were designed around the habits of older phones, about 3 hours of calls a day. Owners used them 6 to 7 hours a day, and the worn-out returns surprised both the brand and its manufacturer.

The list is different for every product. A solar-powered unit on a tank container spends weeks on a ship with nobody near it. A kitchen gadget never sees any of that.

A solar-powered Xeelas unit installed on a tank container in the field.
A solar-powered Xeelas unit installed on a tank container in the field.

Then turn each line into a test with a number and a pass mark.

From abuse list to test planWhat will happen to itThe testPass markIt falls off a tableDrop it from 1 meter onto concrete, ten timesStill works, no cracksIt gets rained onSpray or dip it, to your water ratingNo water insideA winter morningRun it at minus 10 degreesIt starts and sendsA dashboard in summerLeave it at 60 degrees for a dayIt works and nothing warpsThe button, every dayPress it 20,000 timesIt still clicksAn example. Write your own from where your product lives.
An example of an abuse list turned into tests, each with a pass mark. Write your own from where your product lives.

The number comes from how often something happens, times how long you promise the product will last. Take the button as an example. Pressed 20 times a day for two years, it sees 20 x 365 x 2 = 14,600 presses. So you test 20,000, which leaves some room. Promise three years and it's about 22,000 presses, so the test goes up too.

The details of a test matter as much as the number. In one series of drop tests a glass-backed phone cracked 0% of the time on linoleum and about 50% of the time on concrete. That's why the table says concrete.

Write this plan at the start of development and then leave it alone.

Test until it breaks

A pass only tells you the product survived that test. If it survives a drop from 1 meter, you still don't know about 1.1 meters. So keep going. Raise the height, the heat or the voltage in steps until something fails, and write down what failed first.

Now you know how much margin you have and which part is the weakest. A product that breaks far beyond its limits is fine. One that breaks right at them will come back from customers.

Use enough units. Factories tend to offer about 100 samples. For a mass-market product, push for 300 to 400, because a fault that hits 1 unit in 200 may not show up at all in a small batch and still means thousands of returns later.

A basic test program for a normal consumer product costs roughly $300 to $3,000, once. Samsung's Galaxy Note 7 recall covered more than 2 million phones and cost about $5 billion.

Keep testing after launch

A design that passed once can still change under you. A supplier quietly redesigns a component, or the factory swaps a material. So pull a few units from the line every week and run them through the same tests. Do it for at least the first 30 days of every new production run, and again after any change of part or supplier.

Then count what comes back. Put every return, complaint and support ticket in one list, with the date, the serial number and the type of failure. Sort out the ones that aren't failures first. Changed minds and unwanted gifts are a large share of all retail returns.

Count the real failures per cause and sort them from biggest to smallest. Three or four causes usually explain about 80% of them. Fix the biggest one properly, then watch whether its count drops. Small rates matter at volume: 0.05% sounds like nothing, and across 2 million units it's 1,000 dead products.

Set the warranty on purpose

There are two numbers here. Useful life is how long the product should keep working for a normal user. The warranty is the shorter period in which you pay for the repair. Phone makers aim for about 90% of units still working at three years, and 95 to 98% through a warranty of one to two years.

In the EU, consumers get two years by law. The US has no federal minimum, and about one year is normal. So in Europe two years is the least the product has to survive, in the hands of your least careful customer. Check the rules for your own markets with a lawyer before you print the warranty card.

If one part is weaker by nature, give it its own shorter term, and make sure the whole warranty ends before wear-out starts.

Where it goes wrong

Taking the factory's experience as a test result. "We build these every day" costs nothing to say and tells you nothing about your design. The test program costs $300 to $3,000. Run it on your product.

Softening a test because a build keeps failing it. The point of a fixed plan is that you can compare build 3 with build 1. Lower the bar and you lose that, and the weak spot ships anyway. Change the product and keep the test.

Swapping a part without testing again. One camera maker moved to a cheaper display that matched the same drawing, and the housing no longer closed. The first supplier had been more precise than the drawing asked for, and the design had come to depend on it. Run the tests again after every changed part or supplier.

Replacing returned units without counting them. Support ships a new one and closes the ticket, and each case looks like a one-off. Nobody adds them up. One list and a weekly look at the top causes prevents that.