In 2026 we lost a deal at Insyght that we'd chased since November. Insyght is my product studio in Delft, a small team that does the electronics, the firmware, the enclosure, the certification and the production of a connected product under one roof. The company decided to hire an embedded engineer instead (an engineer who writes the software that runs inside a device).
I understand the choice. A salary looks cheaper than a studio invoice. And I know the small-company side. In 2016 I co-founded Xeelas, and the early days there were a small office and a lot of grind.

Months later, the role was still open.
This isn't a pitch for hiring a studio. The plan in that company's head had a number in it, and the number was wrong. A salary line doesn't show the months of recruiting, and those months are rarely in the plan. Doing hardware in-house is slower and more expensive than most founders expect.
That's normal. Almost every first hardware plan is wrong in the same direction: too cheap. Someone budgets "a bit of design" at around $10,000, and the real number turns out to be $100,000 or more. So this post gives you the real numbers: what it costs to get a connected product ready for production, and what one unit costs you once it's built.
The two kinds of money
Every hardware budget has two kinds of money in it. The first is one-time money. The industry calls it NRE (non-recurring engineering): everything you pay once to get the product ready to build. That's design work, prototypes, molds, test fixtures, certification and firmware (the software that runs on the device itself).
The second kind is recurring money, which you pay again for every unit: parts, assembly, packaging, shipping, warranty. Recurring money follows your sales. One-time money doesn't. If you sell zero units, you've still spent all of it.
For a connected product built from scratch, with a circuit board, a plastic housing and an app, the one-time money adds up to roughly $50,000 to $80,000. The simplest products get there for about $20,000. Ambitious ones pass $200,000. These are typical market ranges for the main lines. For the custom IoT products we build at Insyght, I name a higher range in a first conversation: €50,000 to €150,000 for the development alone, with certification, molds and the first run on top. Where a project lands depends on how complex it is, how new the technology is and how much still has to be investigated.
| Item | Typical range |
|---|---|
| Electronics and circuit board | $10,000 to $20,000+ |
| Firmware | $10,000+ |
| Mechanical design | $5,000 to $50,000+ |
| Mobile app | $5,000 to $10,000+ |
| Certification | $3,000 to $20,000+ |
Firmware is the line that runs over most often. About 80 percent of the functions come together fast. The last 20 percent (the edge cases, the bug that shows up once a week) takes far longer than its share. For a battery-powered connected product, that's where I'd keep my largest reserve.
Where the money goes, phase by phase
Lay the budget along the project. About 40 percent goes to the early work: feasibility (finding out whether the thing can be built at all), prototypes, and validation (testing that the design does what the spec says). About 30 percent goes to tooling. About 20 percent goes to pre-production and pilot runs (small trial batches, roughly 40 to 100 units, built on the real line with the real tools). The last 10 percent pays for the first production run. On top of the total you add 20 to 30 percent contingency, a reserve for problems you can't name yet.
The first 40 percent is the bench phase: boards, wires and test setups, rebuilt until the design holds up. My own hardware lab is a mess, and that's what this phase looks like.

Tooling is the part that surprises people. It means the steel molds that shape your plastic parts, plus the fixtures that hold and test the product on the production line. A mold is machined out of a block of steel. Molten plastic is injected into the hollow inside, cools, and comes out as your part. You need one mold for every custom plastic part.
A single mold commonly costs $5,000 to $20,000 or more, and a consumer electronics product usually has 4 to 10 of them. That's how tooling grows to about a third of the budget. Juicero, the connected juice press, was full of custom-designed parts, and its tooling bill reportedly ran into the hundreds of thousands of dollars. Every custom part you remove takes a mold off the budget.
When your prototype works, you've spent well under half the money, even though it feels like you're nearly done. And the pilot runs are a fifth of the budget, which makes them the favorite thing to cut. I wouldn't cut them, because a pilot run is the only place where you find problems in the production process while they're still cheap to fix.
Work out what one unit really costs
The common sum is order quantity times unit price, plus shipping. It always comes out too low.
The price on the quote is the ex-works price, meaning the price at the factory door. Everything that happens after that door is yours to pay, and so is the one-time money.
Here's a made-up example to show the mechanics. You order 5,000 trackers at a quoted $18.00 each. About 3 percent of the units fail their tests and get scrapped, and you pay for those one way or another: add $0.54. Inspection adds $0.40. Freight and import duty add $1.20. That makes $20.14, about 12 percent above the quote. This is your landed cost: what a unit has cost you by the time it sits in your warehouse.
Now add the tooling. Say the molds and fixtures cost $25,000. Spread over 5,000 units, that's $5.00 on every unit, and one unit really costs $25.14.
Volume changes that last line a lot. Over 50,000 units the same tooling is $0.50 per unit. And this example only spreads the tooling. Spread a full $80,000 of one-time money over 5,000 units and it's $16.00 each. The first batch almost never pays back the one-time money, so write down how many units you honestly expect to sell, and divide.
Start at the shop price and work backward
A healthy retail price is five times the factory price, and four times is the minimum that works. The gap pays for marketing, sales, the distributor's cut, returns, and a chip that jumps in price.
In the example, an $18 factory price wants a retail price of $72 to $90. If you planned to sell that product at $45, you're at 2.5 times, and one surprise takes your whole margin. Negotiating with the factory won't close a gap that size. The design has to change.
Design work is only 3 to 5 percent of what a product costs over its life, yet the choices made in it decide roughly 70 percent of that cost. Once you've picked the main parts and the way the housing is made, most of the money is committed. So work in this order:
- Take a retail price the market will pay.
- Divide it by four or five. That's your target factory cost.
- Price a rough parts list before the detailed design starts. Pricing only the expensive parts (display, battery, custom housing) is enough for a first check.
- If the cost is too high, cut features first, then cut the number of custom parts.
- Push the supplier's price down last. A supplier who works at a loss wins the margin back later, with cheaper materials or a price increase.
Add a reserve and plan the cash by month
Add the 20 to 30 percent contingency on top of the whole budget. Then look at when the cash leaves, because a budget can be fine in total and still run out in month nine. Tooling is paid in two parts: a deposit when you order, and the balance when you approve the final sample parts. The factory typically wants 30 percent of the batch value before it starts building, and the rest well before your customers have paid you.
Put every payment on a month-by-month sheet and find the lowest point of your bank balance. That amount, with the contingency on top, is what you need to raise.
Where it goes wrong
Budgeting on an old quote. Supplier quotes are usually valid for about 30 days. One team with a plastics-heavy product budgeted on early quotes and never refreshed them as the design grew. They ended up about 50 percent short, several hundred thousand dollars nobody had planned for. Ask for a new quote every time you freeze the design (the moment you stop changing it so others can build on it).
Changing the design after the steel is cut. Once a mold exists, a design change means machining steel again. Expect a modification to add roughly $10,000. In one case a single small change during tooling added $25,000.
Forgetting certification. Before you may sell an electronic product, a lab has to test that it meets the rules of your market. With a radio on board, the radio tests alone run $2,000 to $10,000 or more. Some teams get a $10,000 lab quote in the middle of the project that was never in the budget. Ask a test lab for an estimate early, and spend about $2,000 on a pre-scan (an informal check of an early prototype) before you order molds.
Skipping the pilot run. It looks like a 20 percent saving. One company that skipped it found that about 30 percent of its parts needed scrap or rework, and the supplier came back asking for roughly 50 percent more.