Blog · The factory

Go and stand on the factory floor

What to look at on a factory visit, what a $1,000 audit buys, and how to find out how much a factory can really make before you pay a deposit.

My first trip to Shenzhen was in 2016. I was the lead embedded engineer at Shake-On, where we built a Bluetooth bracelet that noticed a handshake and swapped contact details between two bands. I flew out to set up production. It was a different world. The speed is unreal.

First photo in China, 2016 — the factory guys we built Shake-On with.
First photo in China, 2016 — the factory guys we built Shake-On with.

On that project we had a lot of trouble with suppliers, mostly over the quality of their LiPo batteries (the flat rechargeable cells you find in wearables), and I made plenty of mistakes there. What stayed with me from the trip was simpler than the speed. Being physically on the factory floor is how you understand how things are actually made. We went on to produce 9,000 bracelets.

I've been going back ever since. In 2018 it was to find batteries that last longer. One of those trips was with my co-founder Koos. Every time, you put on the yellow anti-static coat, the cap and the blue shoe covers. Nobody looks good in that outfit.

A field trip to China with my co-founder Koos.
A field trip to China with my co-founder Koos.

So my first advice on factories is simple. Go.

Then comes the practical part. You aren't an auditor, you have one day there, and everyone in the meeting room is being very friendly. This post covers what to look at, what to ask, what a paid audit adds, and how to find out whether the factory can really make what the salesperson promised.

Three checks that get mixed up

Before you pay a deposit or order a mold, somebody has to go and look. Three different services do that, and each one answers a different question.

A factory audit checks the organization. Someone visits with a checklist and judges whether this factory has the people, the equipment and the habits to make good product again and again. A product inspection checks one batch. An inspector pulls random units from your order and compares them with the sample you approved, for about $300 a visit. A lab test checks what nobody can judge by eye, like lead in paint, radio emissions, or whether a battery cell survives a short circuit.

CheckLooks atMisses
Factory auditSystems, equipment, peopleA bad batch next month
Product inspectionUnits from one batchHidden materials, the next batch
Lab testSafety, chemistry, radio, batteryWorkmanship on other units

Passing one tells you nothing about the other two. In 2007 Mattel recalled hundreds of thousands of toys because a supplier it had trusted for years had used lead-based paint, and nobody was testing independently. Which lab tests your product legally needs depends on the product and the market, so check that with a test lab.

Why the certificate on the wall says so little

Most factories will show you an ISO 9001 certificate. ISO 9001 is a standard for how a company organizes its work: decide how you do things, write it down, follow it, and check yourself. It's generic on purpose, so it fits a circuit board assembler and a bakery equally well.

The certificate is only as good as the body that issued it. Some certification bodies are strict. Others certify almost anyone who pays. So look up who issued it, whether that body is accredited (supervised by a national authority, which you can check online), whether the scope covers your kind of product, and whether the name and address match the factory you're dealing with.

There's a second gap. Most audits check documents, so the auditor spends most of the day in a meeting room. A process audit follows the material through the building and asks at every station what could go wrong here and what stops it. That takes someone who knows the process. One generalist auditor walked through an electronics factory and didn't flag bare circuit boards lying on ordinary cardboard trays, something anyone who builds electronics spots in seconds. Cardboard gives no protection against static electricity (the small spark you get from a carpet), which can damage a chip without leaving a mark.

Eight things to check in one day

Walk the building in the order the material moves, from the warehouse to the packing line, because problems show up at the hand-overs. Half of the list is looking and half is asking.

  1. The test lab. Check whether the equipment is used or dusty. Pick a batch that shipped recently and ask for its test record.
  2. The warehouse. Material should be labeled and dry, not in a pile. Electronic parts soak up moisture from damp air, and that causes defects when they're soldered.
  3. A bad part. Ask what happens when someone finds one. It belongs in a marked bin, away from the good parts.
  4. The last problem. Ask about their biggest quality problem last year. "None" means they aren't telling you. "We fired the operator" means nobody found the cause.
  5. Training. Look for work instructions with photos at each station.
  6. The risky steps. Ask which steps go wrong most often. A good production manager answers without thinking.
  7. Mistake-proofing. Look for jigs and fixtures that accept a part only one way round, so the step can't be done wrong. Without them, quality depends on everyone being careful.
  8. A pilot batch. Ask if they'll run a small one first, about 50 units on the real line with the real operators.
Eight things to look at on a factory visitLOOKThe test labIs the equipment used, ordusty?LOOKThe warehouseLabeled and dry, or apile?ASKA bad partWhat happens when oneis found?ASKThe last problemDid they find the cause,or blame a person?LOOKTrainingAre new operatorstaught, and how?ASKThe risky stepsDo they know whichsteps go wrong?LOOKMistake-proofingJigs and fixtures, or justcare?ASKA pilot batchWill they run a small onefirst?
Eight things to check on a factory visit, from the test lab to the pilot batch.

The last one matters most. A factory that resists a small trial is telling you how the big batch will go. And when they say yes to anything, ask them to repeat the requirement in their own words, because "yes" can also mean "I heard you".

Hire a professional, and go along anyway

An auditor who works for you can spend the whole day on the two things that worry you most. Budget roughly $1,000 to audit three shortlisted factories.

There's data on what that buys. One set of 368 factory audits was matched with later product inspections at the same factories. Factories with a below-average audit score failed a later inspection 47% of the time, and above-average factories 30%.

Audit score, and what happened laterFactories with a below-average audit score47% failed a later inspectionFactories with an above-average audit score30% failed a later inspection
Below-average factories failed a later product inspection 47% of the time, above-average factories 30%.

That link is weaker for electronics, because more can go wrong than a general audit can see. If your product has a battery, plugs into the wall or is made for children, pay for a process audit by someone who knows electronics. For a small factory of 60 people, skip the heavy ISO-style audit and judge it by what you see on the floor.

Ask production how much they can make

A salesperson will tell you they can make 50,000 a month. Real capacity is set by the slowest step, because the whole line moves at its pace, and by rework, because an operator who is repairing units isn't building them.

Here's a made-up example. The machine that places components can do 20,000 boards a day. But every finished unit needs a 90-second test, and there are two test stations running 10 hours a day. That's 40 units an hour per station, 800 a day in total. If 15% of units fail the first time and get tested again, you're down to about 700 good units a day. Over 22 working days that's roughly 15,000 a month, less than a third of the promise.

You care because a factory that accepts an order too big for it will quietly pass work to a cheaper workshop down the road. Your audit then describes a building your product isn't made in. So ask a production manager, on a video call, for daily output and rework percentage per step. People invent numbers far more easily in email or chat.

Go back

When the same problem comes back for the third time, stop emailing and visit. Ask for their account of the last two big issues, and look for a cause, a fix, and proof that the fix is still in place.

Checks lapse when nobody looks. One buyer required dehumidifiers in the warehouse to stop parts from rusting, and the factory switched them off once the attention moved elsewhere. Plan a visit every 6 to 12 months anyway. If you haven't ordered from a supplier for two or three years, treat them as new, because people leave and factories shrink in that time.

I'd make the trip for the city alone, because the hardware energy in Shenzhen is on another level.

The hardware energy in Shenzhen is on another level — with Seeed Studio.
The hardware energy in Shenzhen is on another level — with Seeed Studio.

Where it goes wrong

Treating the ISO certificate as proof. You find out during production that there's no working system behind it, with the deposit already paid. Check the issuer, the accreditation and the scope, then ask to see the last three problem records.

Buying a paperwork audit for an electronics product. It passes, and nobody noticed the boards lying on cardboard. Static damage leaves no mark, so you pay later, in units that fail for no visible reason. Send someone who knows electronics to walk the line.

Judging the factory by its salesperson. A brilliant rep at a weak factory is a classic start to a bad project. Meet the production manager and the engineers, and ask who else knows your product. In one consumer electronics project all the knowledge sat with one engineer, and when he left after about 18 months the project stalled.

Auditing once. The factory you approved two years ago may have lost its best people since. Put the next visit in the calendar when you book the first one.